ABAPRIME-12 is a two components polyamide cured solvent base clear concrete epoxy primer. It is recommended as a sealer on concrete to improve adhesion of subsequent coat to the substrate. Like all primers, ABAPRIME-12 alone is not suitable for immersion in acid or alkaline solutions.
SURFACE PREPARATION
All Surfaces to be coated should be clean, dry and free from contamination. Prior to primer application all surfaces should be assessed and treated in accordance with SSPC-SP13 / NACE 6.
Concrete should be cured for a minimum of 28 days prior to coating. The moisture content of the concrete should be below 4%. All cracks should be filled with ABADUR MP.
Surface preparation shall not take place in following conditions:
Application Method
Material is supplied in two containers as a unit. Always mix a complete unit in the proportion supplied. Once the unit has been mixed it must be used within the working Pot life specified.
1-Agitate part A with a power agitator.
2-Combine the entire contents of part B with Part A and mix thoroughly with power agitator. Start the application right after finishing the defined induction time.
In hot climate, material temperature should be 20 to 25 ºC prior to mixing; otherwise pot life becomes very short.
Application Equipments
Air less Spray |
Tip range 0.017-0.021 inch Total output pressure at spray tip not less than 110 bar (1600psi) |
Air Spray |
Nozzle orifice : 1.8- 2.2 mm Nozzle pressure:3-6 Bar (40-90psi) |
Brush |
Typically 30-60 mic can be achieved |
Roller |
Typically 30-60 mic can be achieved |
.
Please refer to Technical Data Sheet.
TECHNICAL PROPERTIES
Appearance |
Clear liquid |
Mixing Ratio (A:B) |
4:1 (by weight) |
Density (A+B) |
0.9 g/cm3 |
Volume Solid |
35±2 |
Theoretical spreading rate (at 30 microns) |
11.7 (m2/L) |
Induction time |
15 min |
Bond Strength |
> 3MPa (Concrete failure) |
Thinner/Cleaner |
T-200 |
Number of coat |
one |
Application methods |
Air less Spray, Air Spray, Brush or Roller |
Substrate |
Clean and well prepared surface |
Flash point |
25°C |
Drying Time
Temperature |
Touch dry |
Over-coating |
Full cure |
|
Min |
Max |
|||
+15 °C |
9 hrs |
32 hrs |
3 days |
13 days |
+25 °C |
6 hrs |
24 hrs |
2 days |
7 days |
+40 °C |
4 hrs |
18 hrs |
1 days |
4 days |
Pot life
Material temperature |
+15 °C |
+25 °C |
+40 °C |
Pot life |
360 min |
240 min |
120 min |
STORAGE & SHELFLIFE
HEALTH & SAFETY
This product is Flammable. Keep away from heat and open flame .Keep container closed .Use with adequate ventilation. Avoid prolonged and repeated contact with skin. If used in confined areas, observe the following precautions to prevent hazards of fire or explosion or damage to the health:
1-Circulate adequate fresh air continuously during application and drying.
2-Use fresh air masks and explosion proof equipment.
3- Prohibit all flames, sparks, welding and smoking.